This process updates the database |
|
Student Finance |
|
Purpose |
To
add additional days to person payment schedule dates as a bulk process.
Person payment schedules are created for individual students in FINJ6111, and contain the dates on which fee payments are due. The intention of this job is to extend selected payment periods if there has been a delay in running the invoice extract (FINR6120) or posting Statements of Account to students. |
Normally Run By |
A fees administrator |
Anticipated Frequency |
As required |
Update Process(es) |
Updates person payment schedules |
Parameter Sample |
|
Related/Dependent Jobs |
|
Update Process |
The process updates students' person payment schedules to add extra days to specific payment due dates selected by parameter. Details of selection are given below in the Job Parameters section. If a calculated date, once grace days are added, is the same as the date in a subsequent schedule entry, that entry in the person payment schedule is not updated. A message to this effect is given in the job run log. |
Run Details |
This job can only run in batch mode, through the Job Control & Scheduling subsystem. Keep a note of the request number of the job in order to check the run log. The
job is run as required, to alleviate a problem. It is not seen as a
regular part of the fees processing cycle. Dates altered by running this job can be checked in the Maintain Person Payment Schedules form, FINF3800. If an entry in a student's schedule has not been updated for some reason, a message is given in the job run log available in form JBSF5301, which is accessed via JBSF5300. |
Job Parameters |
The
job must be run for each fee period in which it is required to modify
person payment schedules. Select the period from the list of active
fee assessment periods presented in the first parameter. The
next three parameters control the range of students for whom schedules
are updated. The % symbol indicates that all values should be included
for the parameter.
The
remaining parameters specify how the schedules are to be altered.
Entering
a start schedule effective date indicates an entry point into a schedule:
only the entries with payment dates on or after this date will have
grace days added.
|
Last modified