Requests Scheduled For Period Report - JBSR7100

Subsystem

Job Control and Scheduling

Purpose

This report lists details of requests scheduled to run within a nominated period. Details are grouped within scheduled run date.

Normally Run By

Job Scheduler specialist

Anticipated Frequency

As required

Parameter Sample

 

Report Sample

 

Related/Dependent Jobs

N/A

   

Run Details

This job is run to provide details of jobs requested during a specified period.

Refer to the Job Control and Scheduling subsystem for details of scheduling and running online jobs.

 

Job Parameters

Most parameters for this job are used to refine the data set produced in the report.

Specify the period to be included in the report.

The job can be run for:

  • A specified Request Status.
  • A Job Run Status.
  • Job Name.
  • Person; and/or
  • Request Number.

Select a sort combination for the report.

 

Report(s)

Requests Scheduled for Period Report 

 

The report is presented in landscape mode.