Purpose |
This report displays for
individual students in a unit:
This report is run to assist the Boards of Examiners in identifying outcomes that may need to be amended. It may also be used in the 'clean-up' process by running for all 'finalised' but INCOMPLETE results. |
|
Normally Run By |
Assessments specialist and/or Scheduled to run automatically at regular intervals |
|
Anticipated Frequency |
Regularly throughout an assessment period. |
|
Parameter Sample |
||
Report Sample |
|
|
Related/Dependent Jobs |
N/A |
Run Details |
This job is run:
This job is run during assessment periods
to provide information which can be used to:
It is recommended that this job be run in
batch mode. However, it can be run online, particularly where the report is
run with parameters specifying a small data set, such as a specific Unit
Code. Refer to the Job Control and Scheduling subsystem for details of scheduling and running batch and online jobs. |
Job Parameters |
Most parameters in this report are to
refine the data displayed. Several have further functions. They are:
|
Report(s) |
Unit Review Report |
|
The report is presented in landscape mode. It can display RECOMMENDED outcomes,
FINALISED outcomes or both. Where the report displays both, an extra label
indicates if the outcome is R - RECOMMENDED or F - FINALISED. If an outcome consists of an invalid mark/grade
combination, the label FORCED is displayed after the grade. Space is provided at the end of each unit list for the names and signatures of the relevant Examination Board and Assessment Panel Chairs. |
Last modified
on 8 March 2002