Top of PRZ | Index | Table of Contents | Feedback |
PRZF0100 - Maintain Prize Detail
Purpose |
To record basic information pertaining to a prize. |
|
SubSystem |
Prizes |
|
Normally Run By | Administration Specialist | |
Anticipated Frequency | As required | |
Structure | Block | Prize Detail |
The purpose of this form is to record basic information pertaining to a prize. This information is then referenced by other prize related processes throughout the Prizes subsystem, such as Person Prize. This form is accessed from the main menu. |
The Prize Detail block contains:
|
Rules/Notes: When creating a new prize, the Prize Status must be set to PLANNED. Once all the required detials (criteria, donor, etc) have been defined, it can be set to ACTIVE. |
Use this form to record basic information about a prize. The following information is recorded against a prize:
|
Rules/Notes: A Prize Detail record cannot be set to a status that is mapped to a system status of ACTIVE until the following exist:
Only account codes with a system account type of Prize can be associated with a prize detail record. A prize detail record with a prize status that is mapped to a system prize status of INACTIVE must have the end date set. A prize detail record cannot have the end date set unless the status is set to a value that is mapped to a system prize status of INACTIVE. The end date of a prize detail record (if not null) must be greater than or equal to the expiry date. The end date of a prize detail record may not be set to a date that is less than the start date of the prize detail record. A prize detail record with a status that is mapped to a system prize status of INACTIVE or ACTIVE cannot be set to a status that is mapped to a system prize status of PLANNED. A prize detail record that has a status that is mapped to a system prize status of INACTIVE may be set to a status that is mapped to a system prize status of ACTIVE if the end date is removed. A prize detail record that is associated with a prize type that has the monetary indicator set to Y must have a prize value recorded before the prize can be set to a status that is mapped to a system prize status of ACTIVE. The review date of a prize detail record may not be set to a date that is less than the start date of the prize detail record. The expiry date of a prize detail record cannot be set to a date that is less than the start date of the prize detail record. |
Last Modified on 05 May, 2005