Top of CAL | Index | Table of Contents | Feedback |
CALR0320 - Rollover Calendar Report
Purpose |
This report displays detail of the new Calendar Instances, their relationship and the new Date Alias Instances created as a result of running the Rollover Calendar process in Maintain Calendar Type form (CALF0220) |
|
Subsystem | Calendar | |
Normally Run By | Calendar Specialist | |
Anticipated Frequency | Immediately after any Calendar Rollover has been performed | |
Structure | Block | Rollover Calendar Report |
Tab | Parameters |
Run Details This
job is run:
This
job is run as part of the calendar rollover process. The report displays
details of the new calendar instances, relationships and date alias
instances created during the rollover. The report also displays any
exceptions encountered during the rollover process. The
report is automatically run as part of the rollover process, however
it can also be run by itself in batch or online modes at a later date
after the rollover process. Refer to the Job Control and Scheduling subsystem for details of scheduling and running batch and online jobs. Dependent on the Rollover Calendar process in the Maintain Calendar Type form (CALF0220) |
The Rollover Calendar Report block contains: Parameters Tab
|
Rules/Notes: The report can only be run on an individual basis where the Calendar Rollover process has been run at an earlier date. If the rollover process has never been run or the previous logs have been deleted, the Log Creation Date parameter appears empty. |
Last Modified on 2 March, 2004