CALR0320 - Rollover Calendar Report

Purpose

This report displays detail of the new Calendar Instances, their relationship and the new Date Alias Instances created as a result of running the Rollover Calendar process in Maintain Calendar Type form (CALF0220)

Subsystem Calendar
Normally Run By Calendar Specialist
Anticipated Frequency Immediately after any Calendar Rollover has been performed
Structure Block  Rollover Calendar Report
Tab  Parameters

 

Run Details

This job is run:

  • After any calendar rollovers have been performed.
  • At any time deemed necessary for whatever reason.

This job is run as part of the calendar rollover process. The report displays details of the new calendar instances, relationships and date alias instances created during the rollover. The report also displays any exceptions encountered during the rollover process.

The report is automatically run as part of the rollover process, however it can also be run by itself in batch or online modes at a later date after the rollover process.

Refer to the Job Control and Scheduling subsystem for details of scheduling and running batch and online jobs.

Dependent on the Rollover Calendar process in the Maintain Calendar Type form (CALF0220)

 

The Rollover Calendar Report block contains:

Parameters Tab

  • Log Creation Date
    Allows the user to select a log for a specific date on which the calendar rollover process was run.
  • Sort By
    Allows the user to select the field the report is sorted by and whether to sort in ascending or descending order. By default, the report is sorted by calendar category in ascending order.

Rules/Notes:

The report can only be run on an individual basis where the Calendar Rollover process has been run at an earlier date. If the rollover process has never been run or the previous logs have been deleted, the Log Creation Date parameter appears empty.

 

Last Modified on 2 March, 2004